Storage. Rigging. Delivery. Since 1991

Case Study

Hospital

Need to get a 30,000# MRI piece into a hospital building on the 5th floor.

Solution: By using various equipment, a lifting platform, and skillls – ARS Contracting is able to lift and rig this 30,000# MRI through the 5th floor window and transport through the hospital into the designated room for setting.

Testimony: “ARS is always so helpful and gets the job done safely and efficient. Ted is a great representative and works wonderfully with our customers and their specific needs”.

Client: An industry that creates high-level logistical and technical solutions for OEMs of medical devices and essential equipment.

Client Testimonials

Find out what our clients said about cooperation with our company.

The Museum Project required the backend (Generator) to be removed and shipped to the repair shop. The detail that ARS Equipment Movers took to remove the backend from the job site and return it after the repairs were made was nothing short of exemplary. They were flawless in performing their duties. I will certainly use them again."

Vince

Google Reviews

The ARS Foreman, Kevin, knew exactly what he needed to do to bring in the (4) 1000# Electrical Switchgear sections… while traversing some challenging terrain…Kevin’s professionalism and get‐it‐done [safely] attitude did, in fact, get the job done with extreme efficiency and not one issue."

Michael

Google Reviews

We have worked with ARS for more than 30 years and have built a trusted relationship utilizing their services for large Data center projects, hoisting, and setting generators, electrical switchgear, storage of equipment and much more. Thank you, ARS team."

Dan

Google Reviews

Request A Consultation

Need answers for your project? Contact a representative today